- Size
- 910 MW of on-site gas generation for a hyperscale campus
- Taxable real estate (our method)
- $9.1 billion
- Estimated annual tax
- +$309 million a year
- City, school, and county combined, at today’s millage, if the campus is assessed at our $10 million/MW method.
| Locale | Tax base today | Tax base if it is built | Est. annual tax |
|---|---|---|---|
| Monongahela Township | $49 million | $9.15 billion185× today’s assessed value | +$18 million |
| Southeastern Greene School District | $123 million | $9.22 billion75× today’s assessed value | +$208 million |
| Greene County | $1.48 billion | $10.6 billion7.2× today’s assessed value | +$82 million |
1,400 acres along the Monongahela at the old Robena Mine in Monongahela Township. Essential Utilities is installing two gas turbines totaling 910 MW, plus battery storage, to serve on-site data halls. The developer’s Robena Mega Site page: 910 MW, Q2 2028 turbine delivery. Construction of halls is later phases — 910 MW is generation sized for the campus, not a signed IT lease.
Monongahela Township’s assessed base is $49 million; Southeastern Greene is $123 million. 910 MW at our method is $9.1 billion — tens of times either, and several times Greene County’s $1.48 billion tax base.