- Size
- Up to 1.36 GW potential (63 MW on the grid today)
- Taxable real estate (our method)
- $13.6 billion$630 million in the first published phase
- Estimated annual tax
- +$339 million a year+$16 million a year in the first published phase
- City, school, and county combined, at today’s millage, if the campus is assessed at our $10 million/MW method.
| Locale | Tax base today | Tax base if it is built | Est. annual tax |
|---|---|---|---|
| Scrubgrass Township | $75 million | $13.7 billion182× today’s assessed value | +$12 million |
| Allegheny-Clarion Valley School District | — | $13.6 billion— | +$238 million |
| Venango County | $2.09 billion | $15.7 billion7.5× today’s assessed value | +$89 million |
Keel’s own Scrubgrass page and 2026 earnings call describe a 650-acre former generating plant as its largest long-term Pennsylvania campus: 63 MW of existing interconnection, a 750 MW FirstEnergy load study, and more than 550 MW of possible behind-the-meter gas. Add those and the ceiling is 1,363 MW. Until power is secured, Keel says it is not permitting data halls.
We size the full-build sketch on the 1,363 MW ceiling Keel publishes, and the first phase on the 63 MW that is actually interconnected. STEB has not published a 2025 school tax base for Allegheny-Clarion Valley after Venango’s reassessment (it prints as zero). Township assessed value is $75 million.